Every metre of this road has a status.

Nobody set them. Each of the 14,000 cells on this road takes its colour from the inspections raised against it. Approve one, and the road changes underneath you.

Road
SH-30 · Palkhi Marg
Extent
120+000 – 137+500
Length
17.5 km
Layers
EW · GSB · DLC · PQC
Cell
10 m · LHS and RHS

130+520

Section at the cursor

LHSRHS
PQC
DLC
GSB
EW

Awaiting approval — inspection 357 covers 130+520–130+800 GSB RHS.

Drag along the road. Arrow keys step 10 m.

130+520
  • Approved
  • Awaiting approval
  • Rejected
  • Not assigned

Nobody sets a status

A cell is not a field anyone can edit. Its state is computed, every time it is drawn, from the inspections covering it — and the worst case wins, so a failed sixty-metre stretch can never be hidden by the approvals on either side of it.

That is the whole map above: four states, 306 records.

Approved
303 inspections signed off behind the working front, back to 120+000.
Awaiting approval
Inspection 352 — Submitted, 120 m of GSB on the LHS, 130+300–130+420.Inspection 357 — Raised, 280 m of GSB on the RHS, 130+520–130+800.
Rejected
Inspection 341 — 60 m of GSB on the LHS, 130+180–130+240.
Not assigned
Everything ahead of the front. No inspection has claimed it yet.

The evidence comes first

An inspection carries the tests its layer’s frequency plan requires. It cannot go to an approver until every due test has evidence against it — a field sheet read off the page, or a lab result keyed in. The moment the last one lands, it submits itself. There is no override.

Granular sub-base — the frequency plan, as the product holds it

  • Gradation

    Standard
    IS: 2386, Part 1
    Frequency
    1 test per 400 m³
    Acceptance
    Recorded, no limit
    Source
    MoRT&H Table 401 — not in plan
  • Atterbergs Limit

    Standard
    IS: 2720, Part 5
    Frequency
    1 test per 400 m³
    Acceptance
    LL < 25% & PI < 6%
    Source
    MoRT&H Table 402
  • Moisture content prior to compaction

    Standard
    IS: 2720, Part 2
    Frequency
    1 test per 400 m³
    Acceptance
    Recorded, no limit
    Source
    Not Specified in plan
  • Field Compaction Test (By Sand Replacement Method)

    Standard
    IS: 2720, Part 28
    Frequency
    1 test per 1000 m²
    Acceptance
    > 98%
    Source
    MoRT&H Cl. 401.3.2
  • Water Absorption

    Standard
    IS: 2386, Part 3
    Frequency
    As Required
    Acceptance
    < 2%
    Source
    MoRT&H Cl. 401.2.2

What a failure looks like

Inspection 341Rejected

130+180 → 130+240 · GSB · LHS · 60 m

Six pits of field dry density by sand replacement, read off the photographed sheet and averaged by the same arithmetic the sheet prints. It came out under the line, so the inspection could not close and 60 m of sub-base went red on the map — and stayed red until the stretch was re-compacted and re-tested.

IS: 2720, Part 28 — average compaction

96.78%

Required > 98% · MoRT&H Cl. 401.3.2

“Compaction 96.78% — below specified 98%. Re-compact and re-test.”

Two ways in

The console

For the people on the road and the people answering for it.

Seven destinations: an overview that leads with what needs attention, the road itself, every inspection, every test behind them, a work queue ordered by what is latest, reports on throughput and rework, and administration. It reads on a phone in the sun and on a desk in the site office.

The REST API

For the system that already runs the contract.

The same read model over HTTP: cursor pagination, idempotency keys on every write, signed webhooks on every state change. An ERP can raise an inspection, collect its results and reconcile the register without anyone opening a browser.